Showing posts with label 85 Third Street. Show all posts
Showing posts with label 85 Third Street. Show all posts

Wednesday, November 16, 2011

Screen Shot 2011-11-16 at 12.58.29 PM
Once upon a time: the charming old red building at 85 Third Street
(photo courtesy of Property Shark)
3rd Street Demolition, Carroll Gardens, Brooklyn
In 2008, during demo
(photo courtesy of Lisa De Brooklyn on Flickr
IMG_5092
After the building was totally demolished
IMG_5095
IMG_5091
IMG_5098
Stop work order served in October 2008
IMG_4119
The site with the new steel frame, the way it has been left since 2009
IMG_4118
IMG_4118
Recent For Sale sign

Until a few years ago, Number 85 Third Street here in Carroll Gardens, was a small three-story brick building with a nice cornice.  It wasn't the most beautiful house in the neighborhood, but it had its own charm and had stood at that location for over a hundred years. No doubt, it was also a place where quite a few generations raised a family.
In 2006, it was sold for $875,000 to a Mr. A. Weiss, who promptly turned around and secured a loan from Wachovia Mortgage Co. for $ 1,750.000.   By 2008, permits were filed with the NYC's Department Of Buildings for "two additional floors to existing building."  However, instead of adding a vertical extension the entire building was demolished.
DOB caught on and issued a Stop Work Order in October of that year.  After refiling and amending the plans, work resumed in March of 2009.  A brand new steel frame went up quickly and it seemed as though issued had been resolved.  And then...work stopped again.  Since then, little has happened at the site.
By early 2011, the owner had defaulted on his loan and the deed for the property was transferred to Wachovia, which is now part of Wells Fargo.
A quick online search revealed that the property was briefly on the market in April 2010 for $1,190,000. Just recently, a "For Sale" sign was posted on the plywood fence by Tom Marco Real Estate and the price has been dropped to $750,000.  The listing reads: 
"Vacant Land, 1,800 SQ FT, being sold in as is condition, close to all.  No representation. Cash offer only."
The 'vacant land' comes with quite a few DOB violations and monetary fines, which have amassed at the site.  Will clearing and paying for them be the responsibility of Mr. Weiss, Wachovia/Wells Fargo or the new owner?
How terribly ironic that the empty lot is now selling for less than the original house sold for in 2007.  Had the owner just left it standing, it would have been worth a lot more.  And a cute historical house would have been preserved in the neighborhood.

Monday, August 24, 2009



Original Structure at 85 3rd Street back in the fall of 2008


85 Third Street during demolition


The stalled construction site now




Just Another Steel Skeleton In Our Neighborhood

I have been checking on the construction at 85 Third Street off and on for the last year and a half, mostly because I was rather amazed that a permit issued for " a proposed two additional floors on the existing building" could mean the total demolition of the existing building.

Back in the fall of 2008, the sweet little brick house at number 85 was completely taken down, Soon after, a new structure started to rise in its place. The construction site was briefly slapped with a stop work order back in November 08, but that has been lifted months ago.
However, construction has now halted completely, like at so many other sites around our neighborhood.

The building permits were issued to an Eric Hu of BTW Pro, Inc. Anyone know what the deal is?

Related reading:





For Home Page, click Pardon Me For Asking

Tuesday, March 24, 2009

Back in November '08
Only beams of existing structure at 85 Third Street remained
                                           November '08: After demo
November '08: Original structure gone
85 Third Street Today

Looks suspiciously like a new structure
No sign of existing structure
Two 'Stop Work Orders' have been rescinded

So let me get this straight: A developer proposes a two-story addition to an existing building at 85 Third Street. He gets approval and a permit from the Department of Buildings. Then he proceeds to tear the existing structure down and puts a new structure in its place. 


I am not an expert, but even the latest permits seem to still mention that this is an alteration instead of new construction.Pardon me for asking, but is there something I am missing?


****UPDATE****

A reader passed along a photo f what 85 3rd Street looked like in the fall of '08 during demo
Thanks, Lisa De Brooklyn




Related Reading:

Stop Work Order Of The Day: Destroying Existing Building When Permit Only Allows Two Additional Floors